Utilizamos Cookies propias y de terceros para recopilar información para mejorar nuestros servicios y para análisis de tus hábitos de navegación. Si continuas navegando, supone la aceptación de la instalación de las mismas. Puedes configurar tu navegador para impedir su instalación.
Required cookies
Always active
These cookies are strictly necessary for the operation of the site, you can disable them by changing the settings of your browser but you will not be able to use the site normally.
Cookies used
Functional cookies
These cookies provide necessary information to applications of the website itself or integrated by third parties, if you disable them you may find some problems in the operation of the page.
Cookies used
Performance cookies
These cookies are used to analyze the traffic and behavior of customers on the site, help us understand and understand how you interact with the site in order to improve performance.
Cookies used
Guided cookies
These cookies can be from the site itself or from third parties, they help us to create a profile of your interests and to offer you advertising aimed at your preferences and interests.
Cookies used
Se informa al usuario de que tiene la posibilidad de configurar su navegador de modo que se le informe de la recepción de cookies, pudiendo, si así lo desea, impedir que sean instaladas en su disco duro.
A continuación le proporcionamos los enlaces de diversos navegadores, a través de los cuales podrá realizar dicha configuración:
Dual pressure remote charging panel with connections for cylinders of your choice:
DRV DIN 232 bar + DRV DIN 300 bar
DRV INT/YOKE 232 bar + DRV DIN 300 bar
The Dual Pressure Remote Charging Panel includes the “Priority Panel”:
Priority Panel
The priority panel is an ideal solution for simple and effective storage management. It automatically manages the air flow at the filling station between the compressor, the storage bank, and the cylinders. The user only has to connect the empty cylinders to the filling panel and open the valves.
Operation
Compressed air from the storage system is transferred to the cylinder.
If the pressure drop in the accumulator exceeds the delta P set on the pressure switch, the compressor switches on.
The transfer lasts until the pressure is equal to the pressure between the compressed air cylinder and the storage system.
When pressure equilibrium is reached, the compressor fills the cylinder with compressed air until the cylinder filling pressure is reached.
When the cylinder is full, a new switchover takes place via a check valve and the compressor fills the accumulator until it switches off automatically when the maximum filling pressure is reached.
This procedure is carried out without manual intervention.