DECO SMB 12 L
220/2 320 BAR BOOSTER FULL SET
Booster Pump NRC 220/2 320 bar complete set for military diving and rebreather: The Booster 220/2 in a 320 bar final pressure SET. Booster set ready to connect, in a watertight case. Use: rebreather divers for loading small cylinders (2-3 liters), stage-bailout cylinders and loading mixtures in bibottles.
300/2 320 BAR BOOSTER FULL SET
Booster Pump NRC 300/2 320 bar complete set for technical diving and rebreather: The Booster 300/2 in a 320 bar final pressure SET. Booster set ready to connect, in a watertight case. Use: Commercial divers & Diving Centers
ARC EXPLORER MK II
The ARC Explorer Mk IIÂ is the latest generation of Marine Sonic, dual frequency towed side scan sonar designed for search, reconnaissance and recovery applications.
DIAMOND SIDEMOUNT COMPLETE
REEL 60 M
REEL 120 M
WEIGHTING SYSTEM FOR SIDEMOUNT SMALL
REEL W/KEVLAR LINE 200 M
SPOOL 33 M
The spool is made from one piece of very durable Delrin. Can be used as a decompression or safety spool. Consists of the spool cca 33 m of 2 mm PA line and short double-ender. Spool dimension is 76 mm and width 50 mm.
KIDDO WING 12 L RED
RING 14 WING
NRC PICK O2 OXYGEN ANALIZER
RING 14 WING RED
ATT-400 ACOUSTIC TARGET TRANSPONDER
The ATT-400 transponder can operate underwater as a pinger or transponder. This underwater acoustic transponder is small and easy to deploy in depths of 1000m. When interrogated by the STI-350, DTI-300 or VADR series acoustic receivers, the ATT-400 provides range and bearing up to 750 meters away. The ATT-400 can also be programmed to operate as a free-running pinger. With a battery life of up to six months, this transponder is ideal for marking equipment and locations in poor visibility.
RING 17 WING
BASIC COMPLETE HARNESS + KNIVE
QUICK-LINK S.S.
ULB-350 LOW COST LOCATION BEACON
This underwater beacon is a cost effective free-running pinger used for marking equipment and underwater sites to depths of 1,200m. Using a single 9-volt battery, the ULB-350 can send a continuous acoustic signal for up to 60 days or on a programmed time delay for up to three months.